latest tenders
9311-33-4141
Search
delhi latest tenders
delhi
widening to 2 lane with paved shoulder of raipur-jassakhera section (km 0.000 to km 29.770) of nh-458 on epc mode in the state of rajasthan
Authority : Ministry Of Road Transport And Highways
Deadline : 01 Sep 2025
Value :
484.57 Crores
Download
delhi
setting up of municipal solid waste (msw) to energy facility at ghazipur dumpsite, delhi
Authority : Municipal Corporation
Deadline : 18 Aug 2025
Value :
488.77 Crores
Download
delhi
development of 8 lane elevated flyover at tier 1 on single pier including upgradation of existing road to 4/6 lane with 2 lane service road on both sides of nashik phata to khed (pkg-1 12.190 to km 28.925) sec of nh 60 in maharashtra on bot (toll) mode.
Authority : National Highways Authority Of India
Deadline : 25 Sep 2025
Value :
4256.67 Crores
Download
delhi
engagement of user fee collection agency on the basis of cb through e-tender for boriach fp at km 297.300 six laning of surat dahisar section of nh-8 from km 263.000 to km 502.000 nh-48 in the state of gujarat
Authority : National Highways Authority Of India
Deadline : 18 Aug 2025
Value :
420.98 Crores
Download
delhi
development of 8-lane elevated flyover at tier-1 on single pier including upgradation of existing road to 4/6 lane with 2 lane service road on both sides of nashik phata to khed (pkg 2 28.925 to km 42.113) section of nh 60 in maharashtra on (bot) mode.
Authority : National Highways Authority Of India
Deadline : 25 Sep 2025
Value :
3177.66 Crores
Download
delhi
engagement of user fee collection agency on the basis of cb through etender for tp-21 (deora) at ch. 803.353 to tp-29 (bakuntra) at km. 959.692 for 6 lane access-controlled greenfield amritsar to jamnagar economic corridor in rajasthan and gujarat
Authority : National Highways Authority Of India
Deadline : 18 Aug 2025
Value :
264.52 Crores
Download
delhi
development of 8 lane elevated flyover at tier 1 on single pier including upgradation of existing road to 4/6 lane with 2 lane service road on both sides of nashik phata to khed (12.190 to km 42.113) section of nh 60 in maharashtra on bot (toll) mode.
Authority : National Highways Authority Of India
Deadline : 25 Sep 2025
Value :
7434.33 Crores
Download
delhi
construction of 4 lane with ps idar-badoli bypass section from design km 81/300 to km 95/500 of nh 168-g in the state of gujarat (total length 14.200 km) on epc mode.
Authority : Ministry Of Road Transport And Highways
Deadline : 01 Sep 2025
Value :
426.80 Crores
Download
delhi
up-gradation of existing 2 lane to 4 lane with paved shoulder from deshgaon to julwaniya section of nh-347 b from design km 0.000 existing km 99.924 on nh-347 bg to design km 108.643 (ex km 129.900 on nh-52) under nh(o) in madhya pradesh on ham
Authority : National Highways Authority Of India
Deadline : 10 Sep 2025
Value :
1623.51 Crores
Download
delhi
const of flyovers vup at lalacheruvu at km. 907.300 bs id no ap(03) 297 itc junc km.909.000 bs no ap (03)298) and at vemagiri(bs id no ap(03)291 n 292) on 4 lane of nh-216 a in andhra pradesh on epc mode
Authority : National Highways Authority Of India
Deadline : 04 Sep 2025
Value :
209.70 Crores
Download
delhi
construction of 4 laning of sahebganj areraj bettiah of nh 139 w (total length 78.942 km) in the state of bihar on hybrid annuity mode comprising (i) section 1 sahebganj to areraj (38.362 km) and (ii) section 2 areraj to bettiah (40.580 km)
Authority : National Highways Authority Of India
Deadline : 10 Sep 2025
Value :
1981.72 Crores
Download
delhi
strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-04 br-03 br-02 and br-01) of nh-27 from km.156.456 to km.285.007 in the state of bihar on single percentage rate contract mode (2nd call)
Authority : National Highways Authority Of India
Deadline : 03 Sep 2025
Value :
230.38 Crores
Download
delhi
construction of six lane greenfield highway starting from its junction with nh 4 b (new nh 348) near pagote (design km. 0.000) till its junction on nh 48 at chowk (design km. 29.219) in maharashtra to be executed on bot (toll) mode under nh(o)
Authority : National Highways Authority Of India
Deadline : 25 Sep 2025
Value :
3653.09 Crores
Download
delhi
strengthening and major maintenance of muzaffarpur darbhanga purnea section (br-09 br-08 br-07 br-06) of nh-27 from km.0.000 to 145.646 in the state of bihar on single percentage rate contract mode (2nd call)
Authority : National Highways Authority Of India
Deadline : 03 Sep 2025
Value :
307.20 Crores
Download
delhi
engagement of user fee collection agency on the basis of competitive bidding through e-tender (equotation basis) at bharthana fee plaza for six laning of of vadodara-bharuch section of nh-8 on bot basis in the state of gujarat
Authority : National Highways Authority Of India
Deadline : 18 Aug 2025
Value :
674.05 Crores
Download
delhi
construction of 4 lane greenfield section of nh-33 from mokama (design ch. 0.000) to munger (design ch. 82.400) in the state of bihar on hybrid annuity mode
Authority : National Highways Authority Of India
Deadline : 10 Sep 2025
Value :
2243.16 Crores
Download
delhi
supply of 33 nos. airfield crash fire tenders (acfts) aircraft rescue and fire fighting vehicles (arffvs) of 6, 000 liters water tank capacity with 08 years comprehensive annual maintenance contract after 02 years of defect liability period
Authority : Airports Authority Of India
Deadline : 24 Sep 2025
Value :
231.18 Crores
Download
delhi
widening of exis 2 l to 4 l divided carriageway with ps from km 243.800 to km 270.500 of nh 39(rewa to churhat tunnel north portal excluding churhat tunnel)and from km 286.200 to km 313.700 of nh 39(churhat to sidhi sec)l-54.20 km under nh(o) in mp on ham
Authority : National Highways Authority Of India
Deadline : 10 Sep 2025
Value :
900.25 Crores
Download
delhi
construction of 2 lane with paved shoulder from hiwarkhedi-roshni nh-347 b from km 0.000-km 90.010 and 2-4 lane from km 114.000 near ashapur village to km 149.000 near rudhy village of betul-khandwa corridor 125.010 km in mp on ham under nho
Authority : National Highways Authority Of India
Deadline : 10 Sep 2025
Value :
1237.07 Crores
Download
delhi
engagement of user fee collection agency on the basis of competitive bidding through e-tender for idtl a and idtl b fee plaza for six laning of indore-dewas section of nh-3 from km 577.550 to km 610.000 and 0.000 to km 12.60 in madhya pradesh
Authority : National Highways Authority Of India
Deadline : 21 Aug 2025
Value :
187.63 Crores
Download
1
2
3
4
5
6
Next
Free Registration / Login
Subscribe / Membership
Digital Signature Certificate
Tender Alert Service
Tender Bidding Consultancy
NSIC Registration
Gem Registration Service
MSME / Udyam Registration
ISO Registration
Digital Signature (DSC)
Tender Training Program
Gem Training Program
Vendor Registration
Tenders by Value
Not Specified
1 - 10 Lakh
10 Lakh to 1 Crore
1 to 10 Crore
10 to 100 Crore
Above
100 Crore
Classified Tenders
Buy
Sale / Auction
Empanelment
Work Contract
Appointment
Pre Qualification
Expression of Interest
Service Contract
Common Message